3 Bedroom Terraced Duplexes for sale in Lagos, Nigeria, with a total of 7,002 listings.

Almost every person who wants to build a new house goes first for a duplex.The reason is plausible.The building has more rooms than a bungalow.It is important to have an idea of the cost of building a duplex in Nigeria so that you can prepare.It can take between 3 and 6 months to build a duplex.It depends on factors such as availability of building materials and commitment of workers.

The disbursement of funds has a huge influence on these factors.It will be a swift ride if there is money available to fund every stage of the duplex project.It isn't a bad idea to have an idea of the cost of a duplex.This article will help you understand that information.

There are three types of duplex.Detached duplex, semi-detached duplex and terrace duplex are included.There are 3, 4, 5, 6 or 8 bedrooms in this duplex.Different types of duplex have different cost and construction stages.

After differentiating the important stages of building a duplex and successfully combining and approximating cost, one should budget between 25 million and 30 million to begin the building process from foundation to roofing.It could be cheaper to build it in a rural area.It is important to be financially prepared so as to finish building on time.

The prices of different stages of building a duplex will be given in the next paragraph.

It's enough to build a duplex if you get a plot of land and half of it.The location of the land affects the price it will go for.A land in an urban area will cost more than one in a rural area.The most important thing is that the land is legal and gives satisfaction to the buyer.A plot of land can be found for as little as 400,000 and as much as 20 million dollars.The cost of land is determined by location.

There is a legal document that is important when acquiring land in Nigeria.If possible, a lawyer should be involved in the process of giving legal advice for the purchase of a property.Legally documenting the ownership of acquired land is more important than anything else.

Building plans are very important.Everything goes quickly and orderly with a plan.Every detail about what the house would look like is included in a building plan.At this stage, professional advice should be sought.The services of architects and building agencies are needed at this point.The cost of these services can be as high as 5 million.The style and location of the duplex affect the cost.

We move to start building after a building plan is set up.The first stage of building is the setting of a strong and well-constructed foundation.The flooring and soak away are part of the foundation.The ground is dug to hold the house in place.It can take between 1.5 million and 2 million to build a foundation.This cost is used to calculate the price of setting out, evacuate, foundation footings and German concrete.

The structure of the planned design will be built from the ground floor to the lintel level after the foundation has been laid.We have the living room, kitchen, 2 or 3 bedrooms, toilet, bathroom and dining room.At this stage, measurement is very important.It's important for the sizes of rooms, doors and windows.The cost of this stage can be determined by the number of blocks, sand, cement and lintel casting.The stage is constructed from the ground floor to the lintel level.The cost is between 3 million and 5 million.

The second unit of the house is taken care of here.There are stairs that connect the ground floor to the first floor.There is a need for more blocks, sand, cement and lintel casting.There are 2 or 3 bedrooms here, a store room, toilet, bathroom, laundry room and corridors.The cost is between 3 million and 4 million.

The next stage is roofing.The building materials for roofing include roof truss, roofing sheets and ceiling.The cost of roofing depends on the type.The total cost of roofing a duplex is estimated.