Pile Driver Education Requirements Most apprenticeships take three to four years to complete, according to the BLS. Another option is to attend vocational or trade schools. As the BLS notes, some schools provide training in a particular type of construction equipment, such as pile drivers.
How does a Saximeter work?
This hand-held device uses sound recognition to automatically detect hammer blows. It determines the hammer operating rate in blows per minute. A pile inspector can create a driving log by simply pressing one key at every user defined increment of penetration.
How long does it take to drive piles?
Piles may be completely driven in one operation or, if directed by the state, be allowed to set for 2 to 24 hours (or as indicated on the plans) before driving is resumed. Evaluate the procedure being followed for this project. Piles are either plumb (truly vertical) or battered per the plans.
How do piling drivers work?
Traditional pile driving machines work by using a weight placed above a pile that releases, slides down vertically and hits the pile, hammering it into the ground. The weight is raised mechanically and can be powered by either hydraulics, steam or diesel. When the weight reaches its highest point, it is released.
What does a pile driver do?
Pile-Driver Operators use large machines to hammer heavy beams – called piles – into the ground for supporting bridges, piers, or building foundations. After earning a high school diploma or equivalent, many workers learn on the job starting with light equipment.
Why is it called a pile driver?
The name is taken from a piece of construction equipment, also called a pile driver, that drives countless massive impacts on the top of a large major foundation support, burying it in the ground slowly with each impact. The act of performing a piledriver is called "piledriving".