How long should I wait to park on my new driveway?
How long should I wait to park on my new driveway?
The First 14 Days are Crucial – The first 14 days of your new driveway is the most critical period, when the driveway is most vulnerable. Do not drive on your new driveway for 3-5 days. Wait up to 14 days before parking on your new driveway. And when you do, only park on it during the cool part of the day.
How long should you stay off new asphalt driveway?
Q: How long should I stay off the new asphalt? Normally, 24-hours is all that is required to use your new asphalt surface. In very warm weather, we recommend staying off the fresh asphalt for 1 - 2 days, as the surface cools.
How long should you wait to park on new asphalt driveway?
Wait at least 3 full days before allowing traffic on the new asphalt. Since asphalt needs time to harden and cure, usually 6-12 months, your parking lot or driveway will remain soft and pliable until then.
How long does it take for a concrete driveway to cure?
When waiting for concrete to dry, keep these timeframes in mind: 24 to 48 hours - after inital set, forms can be removed and people can walk on the surface. 7 days - after partial curing, traffic from vehicles and equipment is okay. 28 days - at this point, the concrete should be fully cured.
How long should you wait to park on a newly paved driveway?
1. Wait at least 3 full days before allowing traffic on the new asphalt. Since asphalt needs time to harden and cure, usually 6-12 months, your parking lot or driveway will remain soft and pliable until then.
How long does a driveway take to dry?
When waiting for concrete to dry, keep these timeframes in mind: 24 to 48 hours - after inital set, forms can be removed and people can walk on the surface. 7 days - after partial curing, traffic from vehicles and equipment is okay. 28 days - at this point, the concrete should be fully cured.