How long should you stay off your driveway after sealing?
How long should you stay off your driveway after sealing?
During the summer months of May through August we recommend staying off the driveway with vehicles for 48 hours. After September 1st allow 72 hours or more depending on the temperature. Driveway sealer will dry like paint from the top down. It may feel dry on the surface but may still be wet underneath.
Is it OK if it rains after sealing driveway?
Rain and other precipitation will ruin the hard work you put into sealing your driveway. Rain will wash away driveway sealer, resulting in an uneven or nonexistent coat of sealant. Always check your local forecast before sealing your driveway. Sealant must cure for 4–8 hours before it can resist rain.
How long does driveway sealer need to dry before driving on it?
24 hours
What is the best temperature to seal a driveway?
What's the best temperature to seal a driveway? The ideal conditions for application are during the day when pavement and ambient temperatures are at least 50°F and rising, and no rain is forecasted for 24 hours. If these recommendations are not followed, the procedure will not yield desired results.Mar 6, 2018
How long do you have to stay off a driveway after it is sealed?
During the summer months of May through August we recommend staying off the driveway with vehicles for 48 hours. After September 1st allow 72 hours or more depending on the temperature. Driveway sealer will dry like paint from the top down. It may feel dry on the surface but may still be wet underneath.
How long does driveway sealer need to dry before rain?
Driveway sealer needs to be allowed 4–8 hours to dry before rain. Longer cure times are better, as it takes upwards of 24 hours for driveway sealer to completely cure, but under good conditions, 4 hours of curing time will be enough for your new sealant to resist rain damage.