Typically, a pre-fabricated 100×100 metal building materials cost will range between $11.00 to $12.70. In today's market, a steel building cost ranges from $110,800 and $127,000.
What is the average cost of a 60x100 metal building?
An average 60×100, or 6,000 sq ft, metal building will cost between $108,000 and $120,000 for the steel building kit only or $18-$20 per square foot. The shell (building, concrete, and assembly) for an average 60×100 steel building will cost between $114,000 and $150,000, or $19-$25 per sq ft.
How many square feet is a 100x100 building?
10,000 square feet
How much does it cost to build a 50x100 metal building?
When constructing a 50 x 100 prefabricated metal building, expect the approximate cost to vary between $28,000 to $39,000. That is based on current steel material prices in the market. An alternative means of looking at that number is to break it down to a cost of $5.60 to $7.80 per sq ft.
How much does a 100 by 200 metal building cost?
30′ x 40′ $10,000 – $20,000
----------- -------------------
100′ x 100′ $75,000 – $100,000
100′ x 200′ $150,000 – $200,000